Did a large concrete plaza area for the State of Florida this weekend at the Turllington Building. 80% of the concrete was softwshed at a 3-4% strength mixture. A few of the entrances were so heavily speckeld with chewing gum that we went ahead and Pressure Washed those areas.
On Saturday we had a crew of three, today we had a crew of two (not including me as supervisor). Total job time was 9-4 on Saturday and 10-4 on Sunday. Grossed about $250 per hour for the job.
Did a large concrete plaza area for the State of Florida this weekend at the Turllington Building. 80% of the concrete was softwshed at a 3-4% strength mixture. A few of the entrances were so heavily speckeld with chewing gum that we went ahead and Pressure Washed those areas.
On Saturday we had a crew of three, today we had a crew of two (not including me as supervisor). Total job time was 9-4 on Saturday and 10-4 on Sunday. Grossed about $250 per hour for the job.
Here are a few more photos of the job.
At our Tallahasse Revolution Camp, we'll be doing a similar large scale project like this!
Nice work Ray. Made it look new again.
Great results! We need to teach you to take the pix from the exact same spot and from the same angel. :)